Afghanistan

AFCCRBC

Construction & Infrastructure

Founded in 1993 in the UAE, with its main office in Kabul since 2008, AFCCRBC builds roads, bridges, buildings, irrigation and security works for government and international clients.

Full company nameAfghan First Choice Construction & Road Building Company
CountryAfghanistan
SectorConstruction & Infrastructure
RoleConstruction, road building, technical services, project management and machinery.
Founded1993 · United Arab Emirates
Kabul office openedJune 2008
AISA registrationD-27695
Head officeKart-e-Char, Puli Surkh, Kabul, Afghanistan
Türkiye officeKapı Somer No:23, Mah. 09 Sk., Ozgoller, Zeytinburnu, Istanbul, Türkiye
1993Founded in the UAE
19Completed contracts on record
$36.0MRecorded contract value
36Machines in the fleet register

Core capabilities and operating focus.

01Road construction & re-engineering
02Building construction
03Bridges, culverts & retaining walls
04Irrigation works: intakes, canals & karez cleaning
05Topographic survey & road design
06Geotechnical investigation & reports
07Construction management & technical consultancy
08Material supply & machinery
AFCCRBC machinery archive

Road and construction fleet.

The AFCCRBC machinery register: dump trucks and water tankers, graders and rollers, an asphalt paver, loaders, excavators and support equipment.

10Dump truck
4Grader
3Water tanker
3Vibratory roller
2Excavator
2Wheel loader
2Tandem roller
2Pneumatic tyre roller
2Light vehicle
1Bulldozer
1Asphalt paver
1Backhoe loader
1Spray tanker
1Air compressor
1Generator
Show the full fleet register (36)
TypeMakeModelYear
Water tankerMercedes-Benz22241977
Water tankerMercedes-Benz22241977
Water tankerMercedes-Benz26261988
Dump truckMercedes-Benz22171988
Dump truckMercedes-Benz22321987
Dump truckMercedes-Benz22351988
Dump truckMercedes-Benz26321988
Dump truckMercedes-Benz22261999
Dump truckMercedes-Benz26341994
Dump truckMercedes-Benz22361995
Dump truckMercedes-Benz24321992
Dump truckMercedes-Benz22351994
Dump truckMercedes-Benz22361992
Excavator · subcontractorDaewooSolar 130W1996
ExcavatorCaterpillar206X1993
Wheel loaderCaterpillar966D1994
Wheel loaderGscheuch4WD1201996
GraderKomatsuGD405A-11992
GraderKomatsuGD40HT2-10291992
GraderKomatsu—1998
GraderKomatsu—1996
BulldozerKomatsu—1989
Vibratory rollerHAMM2410SSD1991
Vibratory rollerDynapacCD250A1994
Vibratory rollerDynapacCD201A1995
Tandem rollerDynapacCC42A1999
Tandem rollerDynapacCB42A1999
Pneumatic tyre rollerKawasakiKCA31A1998
Pneumatic tyre rollerKawasakiKBA31A1999
Asphalt paverDynapacBG2001998
Backhoe loaderJCB—1998
Spray tankerMazda—1999
Air compressorToyota—2002
GeneratorJB30 kW2009
Light vehicleToyotaCorolla1996
Light vehicleToyotaTownAce1993

Engineers and managers behind the projects.

Waheedullah

Senior Project Manager & Chief Engineer

BS Civil Engineering · Kabul University, 1998

Mohammad Homayoon

Construction Superintendent

BS Civil Engineering · Kabul University, 1998

Mohammad Ajmal

Chief Design Engineer

BS Civil Engineering · Kabul University, 2001

Saied Habib

Quality Control Engineer

BS Civil Engineering · Nangarhar University, 1999

Gull Rahman

Senior Mechanical Engineer

BS Mechanical Engineering · Kabul Polytechnic University, 2002

Mohammad Asif Rashid

Senior Electrical Engineer

BS Electrical Engineering · Kabul Polytechnic University, 2000

What clients wrote about AFCCRBC.

Certificates →
Letter of recommendation · FCEC / UIProjects JV
We have succeeded on this project, completed on time and on budget with the assistance of our project personnel and the hard work of subcontractor AFCCRBC.
FCEC / UIProjects JVLetter of recommendation · 15 March 2011Subcontract on the South of Sharana Road project, Paktika (W917PM-07-D-0012-0001), 2008–2010
Certificate of Excellence · Joint Contracting Command – Iraq/Afghanistan, Sharana Regional Contracting Center
Your willingness to accept direction, attention to detail and professionalism have been excellent. We truly appreciate all you have done to make this a high-quality, safe and successful project.
Joint Contracting Command – Iraq/Afghanistan, Sharana Regional Contracting CenterCertificate of Excellence · June 2010Baki Khel District Center and the 10.5 km Lawara-Skin gravel road, Paktika (W719PM-06-C-05)
Memorandum for recommendation · Civil Affairs Team 312, Task Force Spader, Camp Blessing
A hard-working contractor who invariably understands exactly a project's purpose from the outset, and how to get it done quickly and efficiently.
Civil Affairs Team 312, Task Force Spader, Camp BlessingMemorandum for recommendation · 31 July 2010Projects completed since 2009, mainly in Uruzgan province, including the 15 km Phase 2 road and the 125 m Cutu Crossing bridge

Verified archive material and resources for this profile.

Discuss business with this company.

Send an inquiry through the EWICLO group contact channel and identify the relevant company in your message.

Start an Inquiry →